DOSEN PEMBIMBING:
DIMAS SETIAWAN
G1C014024 AFDHAL KURNIAWAN MAINIL, S.T., M.T.
• Dosen Penguji I:
Helmizar, S.T., M.T., Ph.D
2
TUJUAN
BATASAN MASALAH
1. Sistem Pendingin dan Pengkondisian
Ruang Produksi Spinning 4
2. Data Kelembaban relative dibatasi
diruang Air washer winding
TINJAUAN PUSTAKA
Blowing
Roving OE Yarn
Double Winde r
T FO Pa cking
Wa re house
ALIRAN PROSES SPINNING
MESIN SPINNING
SISTEM PENDINGIN DAN
PENGKONDISIAN UDARA
1. CHILLER
KOMPONEN SISTEM PENDINGIN DAN
PENGKONDISIAN UDARA
2. COOLING TOWER
KOMPONEN SISTEM PENDINGIN DAN
PENGKONDISIAN UDARA
4. DUCTING
HASIL DAN PEMBAHASAN
PERHITUNGAN
HASIL DAN PEMBAHASAN
700
600
500
400
Nilai
300
200
100
0
RH1 W1(K T2 RH2( W2(K Mw
T1(oC)
(%) g/Kg) (oC) %) g/Kg) (Kg/h)
Tahap II(diinginkan) 21.27 98 0.0174 28 70 0.0167 140.76
Tahap I (diinginkan) 28.067 63.4 0.0149 21.37 98 0.0174 230.61
Tahap II(terukur) 22.67 94.5 0.0164 29.3 67.46 0.0174 140.76
Tahap I (terukur) 28.067 63.4 0.0149 22.67 94.5 0.0164 138.4
HASIL DAN PEMBAHASAN
10000
Nilai 8000
6000
4000
2000
0
RH1 W1(Kg/ RH2(% W2(Kg/ Mw
T1(oC) T2 (oC)
(%) Kg) ) Kg) (Kg/h)
Tahap II(diinginkan) 23.26 76 0.018 28 70 0.0167 159.98
Tahap I(diinginkan) 25.73 73.6 0.0153 23.26 76 0.018 10360.67
Tahap II(terukur) 22.86 0.0171 27.6 27.6 77 0.018 159.98
Tahap I(terukur) 25.73 73.6 0.0153 22.86 97 0.0171 121.185
HASIL DAN PEMBAHASAN
10000
Nilai 8000
6000
4000
2000
0
RH1 W1(Kg/ RH2(% W2(Kg/ Mw
T1(oC) T2 (oC)
(%) Kg) ) Kg) (Kg/h)
Tahap II(diinginkan) 23.26 76 0.018 28 70 0.0167 159.98
Tahap I(diinginkan) 25.73 73.6 0.0153 23.26 76 0.018 10360.67
Tahap II(terukur) 22.86 0.0171 27.6 27.6 77 0.018 159.98
Tahap I(terukur) 25.73 73.6 0.0153 22.86 97 0.0171 121.185
KESIMPULAN DAN SARAN
TERIMAKASIH