Transport Load Builder: Unit Objectives

At the conclusion of this unit,


you will be able to:

 Describe the purpose of TLB and where it fits in


the SNP process
 Define a TLB profile

 Define a Lot Size profile

 Run TLB

 Build consolidated TLB loads

3 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential
Transportation Load Builder

 The transport load builder uses the result of the deployment run to create
multi-product transport orders
 Ensures that transportation vehicles are filled to maximum capacity
 Ensures that no transportation vehicles is dispatched that is not filled to
minimum capacity

4 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential
Factors Considered in TLB Run

 Maximum range of coverage


 Minimum/maximum load weight
 Maximum volume
 ATP check

5 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential
Master Data

 Multiple transportation modes


per lane
 Products that can be carried
by a transportation mode
 Transportation capacity by
volume, weight, pallets
 Transportation costs per unit,
product and transportation
mode

6 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential
Master Data

 Transportation Zone*

– Used with the Transport Load Builder to consolidate transportation


capabilities (for example, utilize one truck to make order deliveries to several
locations)
– Combine several locations into a group (thereby creating a zone).
– TLB orders for various locations are considered as one order for one big
location, although, in reality, there are individual purchase orders for separate
locations.
*Indicates a new feature in 3.0

7 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential
TLB Profile

A B
10 >
A
C
D

Requirements Min. Pallets Min. Volume Min. Weight


in horizon

Transport order for


=
transport unit (e.g., truck, train)
for all materials

8 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential
Lot Size Profile

 Maximum lot size

 Minimum lot size

 Rounding value
 Rounding profile

9 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential
Transportation Load Builder Process Flow

Perform a
Deployment
Run

Perform
a TBL Run

Display Display
Detailed Results
Information of TLB Run
About (transport orders
Transport from deployment
Orders run)

Build
Consolidated
Loads for
Transport
Orders

10 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential
TLB - Interactive Planning

 Deployment run results in recommended transport orders


 Transport Load Builder then enables you to manipulate the recommended
transport orders within the time period you specify to build a feasible,
consolidated transport load
 Interactive planning desktop displays the relevant values such as cumulative
volume, cumulative weight, and capacity consumed so that you can
determine when a load is complete
 TLB enables you to build transport loads for one resource on one
transportation lane

11 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential
TLB - Interactive Planning

 TLB interactive planning desktop is similar to the other interactive


planning desktops in Supply Network Planning
 The shuffler, profile selection, planning books/data view, and macros are on
the far left side of the screen
 The work area is displayed on the right side of the screen
 The work area is divided into three sub-areas
– TLB-confirmed shipments appear on the left-hand side of the work area
– Transport recommendations appear on the right-hand side of the work area
– Transport order items appear on the bottom half of the work area

12 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential
Results of TLB Run: Transport Orders

 TLB run for lane


– Source and target location date of TLB run

 Orders generated by TLB


– Products, quantity, weight, and volume for each transport order item
– Totals for each transport order

13 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential
Results of TLB Run: Transport Orders

 Lanes with exceptional situations


– All lanes for which the TLB run was unable to build transport orders

 Remaining orders from Deployment


– For transport order items not processed by the TLB run, the system displays the
products, quantity, weight, and volume

14 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential
Results of TLB Run

Transport Recommendations From Deployment


 Shipping date
 Receipt date
 Product
 Quantity
 Unit (base quantity)
 Purchasing group
 Rounding value
 Storage space
 Priority

15 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential
Build Consolidated Loads

full truck
Minimum Capacity
(best price)
half truck

days
1 2 3

16 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential
Transport Load Builder: Unit Summary

You are now able to:


 Describe the purpose of TLB and where it fits in
the SNP process
 Define a TLB profile
 Define a Lot Size profile

 Run TLB

 Build consolidated TLB loads

17 ©
© 2010
2010 Wipro
Wipro Ltd
Ltd -- Confidential
Confidential

You might also like