• 4 - TOOLS (ICAPS)
Operations
Routine operation
Provisional
Acceptance
START-UP
Ready for
COMMISSIONING StartUp
EXECUTION Mechanical
PRECOMMISSIONING Completion
EXECUTION
Commissioning preparation
CONSTRUCTION
PROJECT
&
COMPLETION ACTIVITIES DEFINITION
Precommissioning preparation
PROCUREMENT
5
DETAILED
General preparation
ENGINEERING
BASIC
ENGINEERING
- Verifications just before the Plant is brought on line to ensure that every
piece of equipment operates as per design.
- Ultimate goals : make the plant oil or gas in as safe and troublefree as
possible.
- Rough split :
¤ Precommissioning = Static Tests
¤ Commissioing = Dynamic Tests
START - UP
CONFORMITY CHECKS
PRECOMMISSIONING MECHANICAL
STATIC TESTING COMPLETION
FLUSHING & CLEANING
ENERGIZATION
PRESTART-UP ACTIVITIES
¤ PRECOMMISSIONING :
- Visual inspection of equipment ( PG , motors , cables...).
Quality of installation
Compliance with Project specs , safety rules, codes,...
COMMISSIONING
« SYSTEM APPROACH »
Project
Sous-systeme 3
Sub-system break-down
Fuel Utility
Oil Gas Water
Exch
Oil to
A Utilities
Exch
B
Exch
C
Heat A Heat B
Drain
ELECTRICAL
PRECOMMISSIONING METHODOLOGY
COMMISSIONING METHODOLOGY
- 1 operational Test
Operational Tests Test:multi-discipline - 1 per subsystem or Procedure by
Network Subsystem, specific
to the installation
Basic Function
HANDOVER PROCEDURE
CONSTRUCTION PLANT - IN
GAS - IN
OPERATION
COMMISSIONING
PERFORMANCE
START-UP ROUTINE OPERATIONS
TEST
MECHANICAL
COMPLETION (ALL UTILITIES PROCESS
SUBSYSTEMS)
READY FOR START
UP
DETAILED ACTIVITY (ALL SUBSYSTEMS)
Construction and precommissioning
Functional testing
CONTRACTOR COMMISSIONING
COMPANY OPERATIONS
CONTRACTOR COMPANY
Permit to Work
Responsibility
Precommissioning dossier
Combined RFC Certificate
One Dossier
Per Sub-
System
Commissioning dossier
Hand-over dossier
RFHO
Certificate
SUB SYSTEM
XX
SUB SYSTEM
YY
SUB SYSTEM
One Dossier
Per Hand Over
ZZ
Unit
Overall dossiers
4 - Tools ( ICAPS )
EXECUTION
PREPARATION PUNCH LIST
OPERCOM
FORMS PROGRESS
POPULATION
ENGINEERING REPORTING
contractual aspects
- The Organization depends on the chosen strategy for the project and its
associated contractual schemes :
- E , P , C = separate contracts
- EPC = single contract
- EPCC + SU ( Turnkey )
- Responsability of completion activities ,
- Precommissioning by Contractors always
- Commissioning by Company if E , P , C or EPC
- Commissioning by Contractor if EPCC or turnkey
Transfer of responsability
- Generally :
- Contractors
- Company ( Project team )
- Company ( Operation team )
- Depending on contracts these transfers happen at various stages :
General chart
TYPE A Project Manager (a) (a) or surface Manager in integrated project organisation
Commissioning
chart
Rule #1
OPERCOM methodology as defined in GS EXP 101,103,105,107 is
mandatory
Rule#2
ICAPS is the mandatory software to be used
Rule#3
Precommissionning is Contractor’s responsibility
Rule#4
Field operation personnel has to witness commissionning activities
Rule #5
For each subsystem, an appropriate Interim Certificate must be issued for
RFC and RFSU
Rule #6
Hand Over Certificates must be issued at the formal transfers of
responsabilities.
Rule #7
The Commissioning Team must be at least at the same reporting level as
the Construction Team within the Project Organisation.
Recommandation #1
Commissionning activities should be the responsability of the Contractor :
i.e EPSCC or EPSCIC Contracts shoud be the preferred case. Selection of
the contractual strategy will be part of the first issue of the Project Execution
Plan (PEP) and will be validated by TDO/PJC and EXP at CTP n° 1.
Recommandation #2
A standard organisation as defined herebelow in article 4.3 should be set
up for commissionning activities.