You are on page 1of 16

A PRESENTATION ON

U-BOOT BETON TECHONOLOGY


AMISH RAJ HARI
B.TECH 3 YEAR STUDENT OF
rd

CIVIL ENGINEERING DEPARTEMENT


Under The Guidance of
Mr. Riddha Chaudhari
Asst. Professor , Civil Engineering Department
CALCUTTA INSTITUTE OF ENGINEERING AND
MANAGEMENT
CONTENT
 INTRODUCTION
 PARTS OF U-BETON
 TYPES OF U-BETON
 INSTALLATION PROCESS
 APPLICATIONS
 ANVANTAGES OF U-BETON
 CONCLUSION
INTRODUCTION
 It is the recycled polypropylene (plastic polymer) formwork technology used
for construction purposes.
 It creates lighter economical design for
structure.
 This is used to construct Two way slab,
large span slab , mushroom slab and
raft foundation in RCC structure. fig-1.0 fig-1.1

 It is suitable for high rise building, hospitals and parking management


residential and industrial building.
PARTS OF U-BETON
 There are main three parts of u-beton,
I. Spacer joint.
 It is used to fix the position of u-boot
during construction.
fig:3-spacer joint
 to maintain the rigid interconnection
that ensure perfect geometric compliance
with design as well as bearing capacity of
formwork.

Fig:4-U-Beton connected by joint.


II. Connection bridge.

III. Closing plate.


Types of u-beton
 Generally two type of u-boot beton ,
I. single u-beton:-it have only upper u-beton with foot and spacer.
where, S
H = height of up U-Boot.
P = height of foot.
S = Spacer height.
Fig:9-single u-beton
 Single U-Beton is available of various up beton height and foot height of base
dimension (52 cm x 52 cm).
II. Double u-beton-It’s having both upper and lower part of u-boot with foot
and spacer.
 This is also available in various size of up u-boot,down
down u-boot and foot height.
where,
P= foot height.
H= Total height of upper u-boot and lower
Fig:10-Double u-beton
u-boot.
 The working dimension of double u-beton is (52cm×52cm).
Installation Process
 The installation process for the u-boot is showing below as step wise,
 Step-I:-place lower reinforment
above the formwork.

Fig:11-formwork ready with lower reinforcement

 Step-II:-Now place the u-boot above


the lower reinforecement  at the
specified intervals provided by the
horizontal link connectors.

Fig:12-placed u-beton over lower reinforcement


 Step-III:-Now complete the upper
reinforcement which above the u-beton.

Fig:13- u-beton with upper and lower


reinforcement.

 Step-IV:-Now pouring of concrete is


being done.

Fig:14- pouring concrete.


concrete
 Step-V:-Now concrete is poured and
slab is ready.
Now after setting of the concrete we
We will un-propped the formwork.
Fig:15-final structure with poured concrete.

 The final slab is looking below as


image given.

Fig:16- U-beton concrete slab.


Applications
 It is used to create large concrete span which having great bearing capacity.
 It’s increases the spacing of columns which gives major benefits.
 It is used in High Rise Building , Commercial building , Hospitals , Parking Lot
etc.

Fig:17- Hospital. Fig:18- Parking Lot. Fig:19- Hotels.


In Raft Foundation
 It can be is also used in raft foundation due
to the following reason,
I. To increase the bearing capacity where
soils having low bearing capacity. U-Boot Beton

II. Can make heavy construction above this


foundation.
Fig:19(a)-Raft foundation using U-Beton
III. Concrete saving as compare to making
general raft foundation.
IV. Provide great bearing capacity with lower
thickness of slab.

Fig:19(b)-Raft foundation using U-Beton


Advantages

I. Economical Advantage.
 Reduction in cost of slab.
 Reduction of Concrete consumption.
 Reduction of Steel consumption.
II. Technical Advantage.
 Fire resistance.
 Reduces effective mass of slab.
 Reduces no. of column.
Fig:20-(a) Fig:20-(b)
 No beams b/w pillers.
Fig:20-(a) without U-Boot Beton.
 Possibility to remove beams
between columns. Fig:20-(b) with U-Boot Beton.
 Extreme earthquake resistance.
 Control vibration.

III. Architectural Advantage.


 Provide larger space.
 Freedom of architectural design.

Fig:21-Seismic resistance building.

Fig:22-Fire resistance building.


Conclusion
 By using this technology we can save more concrete and steel by that structure is
more economical for us.
 Less use of iron in the slabs, pillars and foundation up to a total of 15% .
 There are anti-seismic advantages connected to reduced building weight slimmer
pillars and foundations, there are low chance of seismic effect on the buildings.
Implementation in india
 Project : Shaktidham Temple
 Developer : Bharuka Construction
 Area : 6,340 Sq. Ft.
 Location : Aurangabad , Maharashtra.
Thank You