SERVER ROOM 1 Server room 2

SERVER RACK Lan connector control


pannel

2 48 PORT SWITCH llLan connector switch pannel

1 FIRE WALL l
PATCH PANNEL
4848 port switch
48 PORT SWITCH Patcpatch
pannel
PATCH PANNEL 44848 port switch

48 PORT SWITCH Patch pannel


Connect to lines
48 port switch
PATCH PANNEL

Ppatch pannel
48 PORT SWITCH
SERVER 48 port switch
PATCH PANNEL
Patch pannel
48 PORT SWITCH

PATCH PANNEL
Up links

1.BSNL(20 Mbps)
2.PIONEER(20 Mbps) Switch type; D LINK(L2)
PLACE LOCATION AT NO OF PORTS WORKING NOT WORKING
SERVER
Office area server 1 40 36 4

Reception server1 4 2 2

MD room server1 7 4 3

Conference room server1 4 2 2

Bio metrics server1 5 5 0

Staff workers server1 24 22 2

Lines server1 132 112 20

Office area server2 44 31 13

Lines server2 120 95 25

DT server2 12 8 4

Maintenance server2 4 2 2

FG server2 4 2 2

TOTAL 400 321 79


Before Assessment After Assessment
Can’t identify the end to end cable. Can identify
Can’t identify the cable whether it is Can’t identify the cable whether it is
coming through extension in mid or coming through extension in mid or
not not.
Have no idea of the functional status 79 no’s of I/O ports are not working
of I/O. Observed the damages during out of 400 no’s. It is better to
the LAN cable validation process. change the I/O and face plates.
Have no idea of the functional status 40 no’s of cable are working out of
of Cables. 400no’s.
Have no idea about the server patch Have the proper idea which will help
panel links with the actual us to regularize and minimize the risk
application area. of downtime.

To achieve this, we have to perform


some ground work.

The status which are identified under the Column of After has to be
converted as action items to achieve the expected objective.
PRESENT SITUATION;
D-link switches:
Current status:
1. CELKON has 10nos. Of L2 D-link Switches.

1. 5nos. Are being used in server1 room.

2. 3nos. are being used in server 2 room.

3. 1no. is not used at all still.

4. 1no. Is in live but it is kept for the emergency condition.

Proposal:

• L3 has the routing and switching function in one hardware.

• Even though we purchase L3, still the L2 shall be consumed with


L3 combination which shall improve the performance.
Cable Routing Proposal:

Proper cable routing have to be done.

Benefits: Expected outcome


after routing process
• Easily we can identify the
ports connections.
• We can reduce the cable
break downs.
• Time reduction to
detect where the
problem occurs. Current Status