STARTUP PROCEDURE
BY
PARSHANT KUMAR
What is a Boiler ?
IBR Steam Boilers means any closed vessel
exceeding 22.75 liters in capacity and which
is used expressively for generating steam
under pressure and includes any mounting
or other fitting attached to such vessel,
which is wholly, or partly under pressure
when the steam is shut off.
Technical Data of Boiler (HCM)
• Make : IJT( Isgec John Thompson)
• Type : Water tube, Bi Drum, Membrane wall, Bagasse fired,
Travelling grate, Natural Circulation, Top supported, Balanced
draft boiler
• Capacity : 120 T/H
• Temperature : 515 ± 5°C
• Design Pressure : 99.5 kg/cm²
• Working Pressure : 86 kg/cm²
BOILER LIGHT UP
PRE-STARTUP CHECK LIST
• Check all maintenance work (mechanical, electrical and
instrument) are completed and all permits are closed.
• Check all foreign materials have been removed from the
pressure parts.
• Check all access doors are closed.
• Check all equipment's are trial run successfully.
• Check all interlocks are in line and working properly.
• Check for jamming in rotary equipment's lubrication oil
and cooling water system is normal.
• Check all valve position is normal.
• Check the power supply of boiler and auxiliaries.
PRE-STARTUP CHECK LIST
Confirm The position of the following valves :
• All blow-down and drain valve on boiler and water wall should
be in closed condition.
• All boiler and super-heater filling valve should be in closed
condition.
• Soot blower steam valve must be in closed condition.
• Main steam line stop valve should be in closed condition.
• Attemperation valve should be in closed condition.
• Drum vents should be in open condition.
• Super heater header drain should be in open condition.
• CBD and IBD drain should be in closed condition.
PRE-STARTUP CHECK LIST
Availability of DM water and fuel :