SYSTEM
Truck
QueuingTheory
Job Management
Off-Highway Truck
Load time =
16.5/305 = 0.0540 h (Eq 1)
(12.6/233 = 0.0540 h)
Transit time = 0.5 hr
Use 11 trucks.
Expected production.= 229 BCY/h (175 BCM/h)
EXAMPLE 2
Use 9 dippers.
Load Time = (9 X 22) / (60 X 60)
= 0.0550 hr (Eq 2)
Use 11 trucks.
SOLUTION
Expected production
= (8 / 10.3) X 229
= 178 BCY/h (136 BCM/h) (Eq 6 – 4)
Cost Analysis
= 13 (11.5-BCY trucks)
@ $2.15/BCY ($2.81/BCM)
expected production
= = 0.1
-1
Po =
Po =
Po =
Po =
Po = = = 0.564
Pt = 1- Po = 1-0.564 =0.436
TABLE 6-1 PROBABILITY OF HAUL UNIT
BEING AVAILABLE (Pt)
Optimum Number of Haul
Units
= 12.6 = 0.1
233 x 0.54
Normal production of shovel = 305 x 0.75 = 229 BCY/h
Expected production