FUNCTION :
BUILDING UP OF VACUUM IN THE CONDENSER IS THE FIRST STEP DURING START UP. FOR
BUILDING UP VACUUM, IT IS NECESSARY TO SEAL THE TURBINE GLANDS BY SUPPLYING STEAM
TO THE SHAFT THROUGH THE VALVE . THE CONTROL SYSTEM OPENS THE GLAND STEAM
SUPPLY VALVE UNTIL THE PRESSURE IN THE HEADER ACQUIRES A PRESET VALUE.
SUBSEQUENTLY WHEN THE SET PICKS UP LOAD, THE PRESSURE OF STEAM INSIDE HP AND IP
TURBINE BUILDS UP RESULTING IN THE LEAKAGE OF STEAM FROM THE TURBINE INTO GLAND
STEAM SUPPLY HEADER WHICH IN TURN WOULD RESULT IN INCREASE OF PRESSURE IN THE
HEADER. THE CONTROLLER GRADUALLY CLOSES THE GLAND STEAM SUPPLY VALVE AND OPENS
GLAND LEAK OFF VALVE , IF REQUIRED.
ELECTRO-PNEUMATIC VALVE ACTUATORS
NO PTW IS PENDING
GLAND STEAM SYSTEM IS LINED UP
ENSURE HI TEMP AUX STEAM IS AVAILABLE EITHER FROM UNIT OR FROM OTHER UNIT SOURCE
GLAND STEAM LINE WARM UP VALVE IS OPEN
COOLER IS CHRGED FROM ACW SIDE
SEPERATOR TANK LEVEL NORMAL AND ITS MAKEUP SOURCE IS LINED UP
POWER TO RECIRCULATION PUMP AND VACUUM PUMP IS AVAILABLE
START RECIRCULATION PUMP
START VACUUM PUMP AND OPEN AIR LINE VALVES
CLOSE VACUUM BREAKER
AT 0.06 KG/CM2 CONDENSER PRESS CHARGE TURBINE GLAND SEALING LINE
PUT THE SECOND VACUUM PUMP SET IN SERVICE IN THE SAME WAY
AFTER ACHIEVING COND PRESS AT AROUND 0.08-0.10 STOP ONE SET VACUUM PUMP.
ISOLATION OF ONE VACUUM PUMP SET: