Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

O U T L I N E O F P R E S E N TAT I O N
• Introduction
• Rationale of Research
• Problem Statement
• Research Purpose
• Validity of Research
• Conceptual Framework and Methodology
• Expected Outcomes
• Budget Estimate
• Schedule
• References 1
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

A G R I C U LT U R E I N N E PA L

• Agricultural Country

• 66% directly engaged in farming

• Richly endowed with agro-

biodiversity

• Unfavorable agronomic conditions

• Need to grow diversified crops

2 Source: FAO
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

LAPSI

• Choerospondias axillaris

• Nepali hog plum

• Native to much of Asia

• Cultivated in rural Nepal

• Medicinal purpose (Vietnam)

• Made into pickles, fruit tarts, and sour,

spicy candy
3 Source: Wikipedia
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

LAPSI PITTING

• Removing seeds from fruit

• Has not been commercialized yet

• Thick sticky flesh

• Hard to cleanly separate flesh and seed

• Needs special purpose machine

• Lacks enough research and interest

4 Source: Alibaba
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

NEED FOR RESEARCH

• Preliminary Survey in Sanga

• Seed was separated manually

• Market for a reliable lapsi pitter

• Can help to accelerate manufacturing

• Can be commercialized given a robust

and reliable build.

5
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

REAL LIFE PROBLEM

• Viscous slurry sticks to different parts

• Few similar projects undertaken

• Either crushed seeds

• Or poor flesh separation

• Acceptable flesh separation from

intact seeds

6 Source: flicker
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

RESEARCH OBJECTIVE

• Main Objective:
To design and fabricate Lapsi pitting
machine for improved productivity in
Titaura cottage industries of Nepal.

• Specific Objective:
i. To modify/design existing fruit
pitting mechanisms to suit for Lapsi.
ii. To run experiments/simulations of
the mechanisms.
iii. To fabricate the machine and
compare productivity.
7
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

L I T E R AT U R E R E V I E W
• Pneumatic Assisted Electronically
Controlled Continuous Aonla Seed
Removing Machine (Nambi, Jesudas
& Kulandasami, 2012)
• Design and Fabrication of Nepali Hog
Plum Processing Machine for Small
Scale Industry (Awal, et.al, 2018)
• Automatic Olive Pitting Machine
(Drake, E. P., 1941)
8
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

RESEARCH GAP

• Based on commercial juice extractor

• Not suitable for Lapsi

• Showed by limitations of the research

• Only 56% seed pulp efficiency

• Some seeds break while pitting

9
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

CONCEPTUAL FRAMEWORK

• Literature Review

• Modelling and Simulation

• Fabrication and Assembly

• Performance Evaluation and Testing

• Necessary feedback

10
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

CONCEPTUAL FRAMEWORK

• Literature Review

• Modelling and Simulation

• Fabrication and Assembly

• Performance Evaluation and Testing

• Necessary feedback

11
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

EXPECTED OUTCOMES

• To try to minimize the research gap

• To study and improve upon extracting

flesh of Lapsi efficiently

• Fabricate a robust and reliable lapsi

pitting machine

• Improve efficiency compared to

manual pitting
12
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

E S T I M AT E D B U D G E T
S.No. Particulars Units Quantity Rate(NPR) Total Cost(NPR)
• 1.2 lakhs for procurement 1 Belt pcs 2 525 1050
2 Bearing pcs 5 630 3150
• 20% margin of estimation error 3 Motor pcs 2 14000 28000
4 Stainless steel sheet pcs 1 60000 60000
5 Stainless steel shaft pcs 2 4000 8000
• Total estimated budget of 2.05 lakhs 6 Bolts and Nuts pcs 150 12 1800
7 Pulley pcs 4 1300 5200
8 Castor Wheel pcs 4 950 3800
9 Steel Section pcs 2 1500 3000
10 Lapsi kgs 50 40 2000
11 Nylon Rods kgs 5 950 4750
Total 120750
12 Fabrication Cost 60000
13 Miscellanous (20% of Total) 24150
Net Total 204900

13
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

TIME SCHEDULE

• Design and Simulation before Mid-

term defense

• Fabrication immediately after

• Parallel testing and evaluation with

Fabrication

• 15 days for final touchup

14
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

16-Dec-2018 4-Feb-2019 26-Mar-2019 15-May-2019 4-Jul-2019

Proposal Writing

Literature Review

Field Visit

Concept Design and Research

Designning of the System

System Simulation

Fabrication and Assembly

Testing and Evaluation

Updating the Machine

Documentation

15
Problem Research Expected Budget
Introduction Rationale Validity Methodology Schedule
Statement Purpose Outcomes Estimate

REFERENCES
1. Chhetri, R. & Gauchan, D., 2006. Traditional knowledge on fruit pulp processing of Lapsi in Kavrepalanchowk district of Nepal.
Indian Journal of Traditional Knowledge.
2. FAO, 2015. Nepal At a Glance. [Online]
Available at: http://www.fao.org/nepal/fao-in-nepal/nepal-at-a-glance/en/
3. Fellows, P., 2000. Food Processing Technology. 2nd ed. CRC Press.
4. Freedonia, 2018. World Food Processing Machinery. [Online]
Available at: https://www.freedoniagroup.com/industry-study/world-food-processing-machinery-3275.htm
5. Lama, A., Awal, B., KC, P. & Khanal, Y., 2018. Design and Fabrication of Nepali Hog Plum Processing Machine for Small Scale
Industry, Kathmandu: Thapathali Campus.
6. Ministry of Finance, Government of Nepal, 2012. Economic Survey of Fiscal Year 2011/12, Kathmandu: Ministry of Finance,
Government of Nepal.
7. Nambi, Jesudas & Kulandasami, 2012. Pneumatic Assisted Electronically Controlled Continuous Aonla Seed Removing
Machine. CIGR Journal, 14(2), pp. 14-44.
8. Paudel, KC, Laimer, M. & Laimer, M., 2003. Evaluation of Lapsi tree (Choerospondias axillaris, Roxb.) for fruit production in
Nepal.
9. Rajbhandari, R., Shrestha, L. K. & Pradhananga, R. R., 2012. Nanoporous Activated Carbon Derived from Lapsi
(Choerospondias Axillaris) Seed Stone for the Removal of Arsenic from Water. Journal of Nanoscience and Nanotechnology.

16

You might also like