INTRODUCTION
 What is Scheduling?

 What are the important tasks of


scheduling?

 What are the principles of


scheduling?
OBJECTIVES
 Making efficient use of the labour
 Increasing the profit & the output
 Improving the service level
 Maximizing the delivery performance
 Reducing the manufacturing time
 Minimizing the production costs & the
worker costs
SCHEDULING •Forward
•Backward
APPROACHES
TO
•Infinite
LOADING •Finite
SCHEDULING SERVICE
OPERATIONS
 What Is Service Scheduling?

 Strategies For Service Scheduling :


• Peak demand strategy
• Hire & fire strategy
• Variable price strategy
• Self-service strategy
• Flexible capacity strategy
MASTER PRODUCTION
SCHEDULE
 What is Master Production Schedule?
 Objectives of Master Production
Schedule:
• Deliver end product as per requirement of customers on
proper time.
• Proper balancing between maximum utilization of production
capacity & idle time of machinery, jobs & workers.
Advantages of MPS
 Develops aggregate planning
 Processes material requirement
 Develops capacity plans
 Utilizes capacity efficiently
 Fixes up priorities
TIME FRAME IN MASTER
PRODUCTION SCHEDULE
 Frozen time fence
 Firm fence
 Full fence
 Open fence
DEVELOPING MASTER
PRODUCTION SCHEDULE
JOB SEQUENCING
 The process of determining the job order on some machine
or in some work centre is known as sequencing or priority
sequencing.

 Priority rules are the rules used in obtaining job sequencing.

PRIORITY RULES FOR JOB SEQUENCING:


 FCFS (First-come, first-served)
 SOT (Shortest operating time)
 EDD (Earliest due date first)
 STR (Slack time remaining)
 LCFS (Last-come, first-served)
“n” Jobs On One Machine
Illustration:

SOLUTION: 1. FCFS RULE


FCFS CONTD:
Total flow time= 3+7+9+15+16=50 Days
Mean flow time=50/5=10 Days
Job will late by (0+1+2+6+14) Days
2.SOT RULE:

Total flow time=1+3+6+10+16=36 Days


Mean flow time=36/5=7.2 Days
Job will be late by (0+0+1+4+7) Days
3.EDD RULE

Total flow time:1+4+8+10+16=39 Days


Mean flow time:39/5= 7.8 Days
Job will be late by (0+0+2+3+7) Days
“n” Jobs On Two Machines
JOB OPERATION TIME ON OPERATION TIME ON
MACHINE 1 MACHINE 2
A 3 2
B 6 8
C 5 6
D 7 4

Solution:-
Step 1:List operation time
Step 2&3:Select the shortest operation time and assign
Step 4:Repeat steps 2&3 until completion of the
schedule.
Solution sequence is C B D A and the flow time is 25