4.Groundwater
Investigation Using Amarachi R Alisiobi, Methods employed
Combined and B. D. Ako in groundwater
Geophysical Methods exploration
ANALYSIS OF DATA
Town Panchayat Quantity allotted from WSS Present Level of supply with
with Siruvani Source(in litres) river source (in lpcd)
Perur 142500 16
House Service
Bore well with Over Head Tanks
Town Panchayat Connections
power pump
Capacity(Litres) Nos.
60000 1
Perur 9 1193
30000 5
TEMPLE
Inlet
Cover slab
Free Board
MWL
Over flow
Storage depth
Scour Depth LWL
Floor Beam
Floor Slab
Over flow
6m
Bracings
Outlet
PR
410.250
BW 6
60
5
413.210 7
100
7
415.235
8
8
5 145 73 415.890
11 60
60 9
26
416.210 9
10 10 416.635
4 413.875 46 12
50 11
4 415.635 30 415.720
13
12
30
3 14 15
24
13
415.390
415.650
66 16
14
415.110
3
288
2
417.415
370
17
2 88
1 16
1 417.610
417.600
10 18
15
BM : 417.880 417.620
5/13 PERT CHART
1 2 3 5 7
10/13
7/13 6
Activity Description
1-2 Getting Administrative Sanction
2-3 Getting T.S & Tender finalisation
2-4 Land acquisition
3-5 CWTM, Feeder mains etc
3-6 SR & D.SYSTEM
6-7 Pump house & pump set
PIP
SLN E FROM TO NODE NODE QTY IN
O NO NODE NODE Length POP NO GL POP LITRES LPS
1 1 1 16 10 3 1 417.6 0 0 0.000
2 2 16 2 88 29 2 417.6 61.5 2460 0.028
3 3 2 3 288 94 3 417.4 60 2400 0.028
4 4 3 4 50 16 4 415.4 31.5 1260 0.015
5 5 4 5 145 47 5 413.9 33.5 1340 0.016
6 6 5 6 60 20 6 413.2 26.5 1060 0.012
7 7 6 7 100 33 7 410.3 32 1280 0.015
8 8 7 8 73 24 8 415.2 22 880 0.010
9 9 8 9 60 20 9 415.9 14 560 0.006
10 10 9 10 26 8 10 415.6 11.5 460 0.005
11 11 10 7 60 20 11 416.2 12.5 500 0.006
12 12 10 11 46 15 12 416.2 14 560 0.006
13 13 11 12 30 10 13 415.7 14.5 580 0.007
14 14 12 3 30 10 14 415.6 70 2800 0.032
15 15 12 13 24 8 15 415.6 61 2440 0.028
16 16 13 14 66 21 16 415.7 17.5 700 0.008
17 17 14 15 370 119
18 18 15 16 10 3
Total cost
------------------------------------------------------------------------------
Combination COST OF COST OF E.B COST OF TOTAL
No. PUMPSET CHARGES P' MAIN AMOUNT
------------------------------------------------------------------------------
Comb. 1 149558 958423 33390 1141371
Comb. 2 149558 875610 46620 1071788
Comb. 3 149558 871787 67410 1088755
------------------------------------------------------------------------------
Sl.
No Contents Description Rate Per Amount
3
1 Earthwork excavation and depositing on 36.40 m 12.41
3
0.341m bank with initial lead of 10 m and lift of 2 m
in Hard stiff clay, stiff black cotton soil, Hard
red earth, Shales, Murrams and earth mixed
with small size boulders etc., as per SS 20 B.
3
2 Plain Cement Concrete 1:4:8 (One cement, 2770.52 m 1759.28
3
0.635m four sand and eight aggregate) using 20 mm
HB stone jelly for foundation including the
cost of mixing concrete,ramming,curing etc.,
complete,
Rs. 1936.15
Total
Distribution system as per Sl.No. 8.1 of TWAD Board Manual
Laying and jointing of 90 mm PVC 4 KSC pipes
Sl. Quantit
Description Rate Per Amount
No. y
1 1536MEarthwork excavation in all types of strata for laying 57.33 M 88058.88
of pipes with the standard trench width as per Board
circular No.28 / AE10 / (P&D) / 2001 dt.1.10.2001 &
JCE (P&D) Lr. No.LM / AE 10 / (P&D) / 2001 /
DT.22.11.2001
2 1536MSupply of unplasticised PVC rigid pipes as per BIS 78.50 M 120576.00
4985 -1988
3 Supply of PVC specials as per BIS 10124 -1988 part
1 to 13
a 5 Nos90 mm PVC equal tee 72.00 No. 360.00
0
b 9 Nos90 mm x 90 PVC bend 74.00 No. 666.00
4 1536MConveying the PVC pipes and specials to trench, 6.30 M 9676.80
lowering in to the trenches , laying to proper grade
and alignment, jointing with PVC coupler and
specials fixing with neat cement paste and testing to
the required pressure as per IS including conveyance
of water from 1 KM lead for filling during testing.
5 1536MRefilling with excavated soil complying with 7.99 M 12272.64
standard specification in layers of 15cm thick well
rammed and consolidated after the pipes and specials
are laid and tested
Inspection charges on Pipe cost @ 0.039% for DI 4702.46
Pipe
Total 236313
Pump room size 1.50m x 1.50m (with brick work/ conventional
footing) as per TWAD Manual
50400.0
Total
0
Conveying main as per Sl.No. 6.3 of TWAD Board Manual
Laying and jointing of 90mm PVC 6 KSC pipes
Sl.
Quant
N Description Rate Per Amount
ity
o.
1 630MEarthwork excavation in all types of strata for laying of 57.33M 36118
pipes with the standard trench width as per Board
circular No.28/ AE10 / (P&D) / 2001 dt.1.10.2001 &
JCE (P&D) Lr. No.LM / AE 10 / (P&D) / 2001 /
DT.22.11.2001
2 630MSupply of unplasticised PVC rigid pipes as per BIS 115.00M 72450
4985 -1988
3 9NosSupply of PVC specials as per BIS 10124 -1988 part 1 74.00No. 666
to 13
90mm x 90 pvc bend
4 630MConveying the PVC pipes and specials to trench, 6.30M 3969.00
lowering in to the trenches , laying to proper grade and
allignment, jointing with PVC coupler and specials
fixing with neat cement paste and testing to the required
pressure as per IS including conveyance of water from
1 KM lead for filling during testing.
5 630MRefilling with excavated soil complying with standard 7.99M 5034
specification in layers of 15cm thick well rammed and
consolidated after the pipes and specials are laid and
tested
Total 118237
•The distribution system was designed to meet the water
requirements of the floating population of Sri Patteeswarar
Temple and to be economic.
•The data obtained from the Perur Town Panchayat
contained all information like the general particulars,
population and existing water supply system of Perur that
were essential for our project.
•The norms and standards given by the TWAD were useful
in designing an efficient system for Perur.
•The bore well sample was collected and tested for
water potability .
•The water test report proved that the water was
chemically potable.
•The location and dimension of the bore well was
decided from the hydro-geological survey in such a
way that there was sufficient supply of water
throughout the year.
•The designed tank capacity was adequate to meet the
demands of the floating population.
•The layout of the looped water distribution network
sketched using AutoCAD was useful in denoting all
essential data like length, nodes and levels.
•The LOOP software facilitated in the calculation of
pressure in the pipe network.
•The ECP software was useful in the calculation of
economy of the main pipe.
•The PERT gave the duration of necessary works that
had to be carried out before the commencement of the
laying of water distribution system.
Alisiobi, A. R. and Ako, B.D. (2012) ‘Groundwater
Investigation Using Combined Geophysical Methods’,
Search and Discovery Article.
CPHEEO Manual (1999) ‘Manual of Water Supply and
Treatment’, third edition.
Garg, S. K. (2011) ‘Water supply Engineering’, Kanna
Publishers, Vol. 1.
Hickey, H. E. (2008) ‘Water Supply Systems &
Evaluation Methods’, A project report Society of fire
protection engineers.
Kishor, S., Sable, Jayashri, S., Khose and Madhuri, K.
Rathi (2012) ‘Comparison of Different Bearing Types
Performance For Water Tanks’, International Journal of
Engineering and Innovative Technology.
Maiti, S. K. (2001) ‘Handbook of Methods in
Enviornmental Studies’, Water and Wastewater Analysis,
ABD Publishers, Vol.1, pp. 3.
Mureker, N. R. and Khedikar, I. (2011) ‘Design of
Distribution Network of Water Supply for Kudwa and
Katangi-Kala Villages’, International Journal of
Engineering Sciences and Technologies, Vol. 7, Issue 2,
pp. 178-196.
Olayinka and Mbachi (1992) ‘Geo-electric assessment
and Geographic Information Systems (GIS) approach’,
International Journal of Water Resources and
Environmental Engineering, Vol. 3(4), pp. 77-86.
Roger Schmid (2002) ‘Review of modelling software
for piped distribution networks’, The Swiss Centre for
Development Cooperation in Technology and
Management, SKAT publishers.
Suryanarayan, R. (2011) ‘Sri Patteeswarar-The Lord
for Liberation of the Atman at Perur’ SMK Publisher.
THANK YOU