You are on page 1of 17

Litewalk grating

used in the commercial market


Petronas Gas Bhd (PGB)

• Litewalk has been installed / to be installed at these projects:-

1 Hutan Melintang gas terminal – Supplied Sep 2018 Hammer engineering


2 Tebong Gateway Melaka – Supplied Jan 2019 Axienergy
3 TUAH Piping Melaka – WIP May 2019 Axienergy
4 Shadow Shah Alam – June 2019 (Misi Setia)
5 Southern Power Generation (SPG) Pasir Gudang
– July 2019 (Asia Propel)
6 Sea water intake Melaka – Aug 2019 (Muhibbah Engineering)
Metering skid for Petronas Gas Bhd (PGB) at
Hutan Melintang PGB Gas Terminal in Perak
TUAH Project for Petronas Gas Bhd (PGB)
in Alor Gajah Melaka
PWT Skid for Petronas Carigali
Petronas & MITCO

Asian Supply Base, Labuan


PWT Skid on Sumandak Platform Qty :- 30m²
Qty :- 60 m²
Produce Water Treatment skid
on Sumandak phase 2
PWT on Sumandak phase 2
Condensate Recovery skid
• Owner of FPSO:-
GALOC Tamarind- Philippine

• Contractor: Asia Propel

• EPC:- NGL Tech


Condensate Recovery skid
BRB Silicone Synthesis - Westport
BRB Silicone Synthesis - Westport
BRB Silicone Synthesis - Westport
Jet Fuel Tank – Subang airport

Petronas Dagangan
Bear Conservation Centre - Sabah
THANK YOU

Bugs Tan PhD


Mastek Oil Tools
bugs@mastek-ot.com.my

You might also like