• Litewalk has been installed / to be installed at these projects:-
1 Hutan Melintang gas terminal – Supplied Sep 2018 Hammer engineering
2 Tebong Gateway Melaka – Supplied Jan 2019 Axienergy 3 TUAH Piping Melaka – WIP May 2019 Axienergy 4 Shadow Shah Alam – June 2019 (Misi Setia) 5 Southern Power Generation (SPG) Pasir Gudang – July 2019 (Asia Propel) 6 Sea water intake Melaka – Aug 2019 (Muhibbah Engineering) Metering skid for Petronas Gas Bhd (PGB) at Hutan Melintang PGB Gas Terminal in Perak TUAH Project for Petronas Gas Bhd (PGB) in Alor Gajah Melaka PWT Skid for Petronas Carigali Petronas & MITCO
Asian Supply Base, Labuan
PWT Skid on Sumandak Platform Qty :- 30m² Qty :- 60 m² Produce Water Treatment skid on Sumandak phase 2 PWT on Sumandak phase 2 Condensate Recovery skid • Owner of FPSO:- GALOC Tamarind- Philippine