Management At
HVAL
Arijit Mitra
Inderjit Singh
Mridul
Sharma
Rahul Rai
HVAL
• Formed in March 2000
• Manufacturing Axles & Axle parts for Medium & Heavy
Commercial vehicles
• B2B Entity
• Capacity of over 3.6 lakh axles per annum.
Meritor,
Tongil,
Steyr
REAR AXLE
LIVE FRONT AXLE
A. P.K.
Jamaiyar G. Ahuja
(CFO) Choudhury S.Aich (AGM Plannin
(COO) (DGM Engg.)
CQ& CM Matl. & ADD HR and BES PPC RABU FABU DHBU
3 BUSINESS
UNITS
IDEAL PROCESS FLOW DIAGRAM
PROCESS PLANNING
LONG RANGE
MATL .
REQUIREMENTS CAPACITY DAILY
PLANNING PLANNING WORKFORCE
SCHEDULING
ORDER
SCHEDULING DISPATCHING
SHORT
RANGE
W / H RECEIPT
PLANNING
ENTERPRISE PROCESS MODEL
l
ve
Le
Vision
c
Mission
gi
Core Values
te
ra
Strategic
St
Direction
Leader System
LEVEL 1
l
LEVEL
Le
3
on
ti
ta
en
em
Infrastructure creation
Vendorand
mgmt
maintenance
, material and logistics
pl
Im
SUPPORT SYSTEM
1 Human Resource Mgmt 7 Finance8 and budgeting 9
Facility and Environment Mgmt
Process No. 5: Production & Delivery
Process
SUB PROCESS NO SUB PROCESS NAME OWNER DEPT.
5-01 Production, Planning & Scheduling PPC
5-07 Vendor Performance Monitoring & Improvement Process Materials & ADD
5 - 04 to 5 - 09
STRATEGIC CAPACITY PLANNING 5 - 01
SUPPLY NETWORK PLANNING
MATL .
REQUIREMENTS CAPACITY DAILY
PLANNING PLANNING WORKFORCE
SCHEDULING
W / H RECEIPT
PLANNING
Department NEW PRODUCT
DISPATCH REGULAR
Interactions PRODUCT
ENGINEERING PRODUCTION
HUMAN RESOURCE NEW PRODUCT PLANNING &
(PSD) RESEARCH INTRODUCTION
CENTRE CONTROL
MANPOWER MASTER
PRODUCTION
AUTO SCHEDULE
INBOUND DEVELOPMENT MRP
LOGISTIC DEPARTMENT
MATERIALS
SPIG
MI M2 M3
SUPERVISIORS
TM2-TM3(Manager Grade)
AllPPC
day planConfirmation
from TML aggregate
from PPCMaterial
, Jamshedpur
ADD & meeting dept
at TML
andtoProduction
freeze schedule
Dept (9for next
to 10 a.mday
.) (This is ca
Getting
ent (finalinformation from Material
) to every department ( HR, for
Circulation
deciding
Quality the
of priority
the etc
,Production requirement
) (Confirmation
to ADDof
, Material
4-5 Days)and COO
Demand Forecasting
Method of forecasting: Done by Tata Motors. Mainly experience from the past sales and data
•
Error in forecasting: Cost is born by Tata Motors, so they take care of. Demand is Dependent
•
in nature.
Demand sources
•
Key Points
•
• Bullwhip effect is not considerable as less number of parties are involved in the supply chain
• Demand of vehicle is cyclical. It increases in Jan to March and decreases from April to June
• Cyclical component: model based. Overall it is cyclic
• HVAL is answerable to Board if they are not able to meet the demand.
• Inventory Audit is done on daily basis.
• Lucknow-Bucket Plan (May be for a week)
• Spare parts (Monthly Plan)
• Seasonality factors: Yes, some bonus in some season
• Random variation: Taken care at the time of release
• Planning strategy: Determined by
PSD, Dominantly chase
• Backordering cost: Indirect cost is
there. HVAL is answerable to board.
• Inventory control: PPC is
responsible for the FG inventory.
• Inventory calculation: Manual
audit and SAP.
D A ILY P LA N
MONTHLY PLAN
AUTO DEVELOPMENT
DEPARTMENT
List given by NPI (BOM) Categorization from Requirement sent to 3-4
along with design BOM given by NPI (A,B,C suppliers with documents
documents and quotation asked
NO Quotation, if obtained
Negotiation of sent to Price panel for
Rejecte OK? supplier with price estimation of cost acc. To
d panel Zero Based Costing
YES
NO
YES
Ownership YES
transferred to Inspection PPAP lot
materials dept. OK?
by SQIG demanded
for regular
supply
• Supplier Selection basis:
• Quality (both for new and regular part)(% of Rejection)
• Cost (both for new and regular part)
• Capability (both for new and regular part)
• Delivery time (for regular part)
• Requirement of documents from suppliers
• Inspection Check
• PFP
• Control Plan
• Failure Mode Effect
• Metallurgical grain flow report
•
• Commitment Inventory Category
•
• A- Inventory up to 10 days
• B- Not expensive, inventory up to month
• C- Low value items, up to 3 months
•
• Key Points
MATERIALS DEPARTMENT
ERC
NEW
NPI Demand ADD
schedule
PPC REGULAR
Aggregate
Yearly,
Par Source monthly &
t Daily schedule
for supply
INSPECTION
YES BY SPIG
Supply to ( QA ) Follow up with
Productio OK? Supply to
store suppliers
n line
NO
Inventory control
•11 days inventory is being kept by Material dept. Value based Inventory
system.
• Basis of the 11 days:
•Geographic location
• Cost of part
• Lead time
• Shelf life of the material
• Order quantity/volume
•
Key Points
•
PLANNING
PROJECTED VOL OF PRODUCTION
(WITH VARIATION )
MANPOWER
REQUIREMENT
MANPOWER CALCULATED AS PER
STANDARD (FOR THE VARIATION
ALSO)
ASSESSMENT BY NO
PSD OK Demand from
production
YES
DIVISIONAL HEAD
FEEDBACK
FINAL GRADING
• Key Activities:
• Audit for document adherence (Mainly for NPI, ERC and
Quality Department) as per the guidelines of Tata
Business Excellence model
• Supplier quality Assurance (at the supplier end)
• Quality inspection before sending to assembly line
• Pre-dispatch inspection of the finished product
• Statistical process control:
•DFMEA and PFMEA
• Flow chart
• Run Chart
• Pareto chart
• Fish Bone diagram
• Check-sheet
• Opportunity Flow diagram
• Process control chart
• Quality at supplier end:
• Zig and fixture quality (critical dimensions checking)
• Process capability of supplier
Quality Assurance
department
An example of Quality Control
Process
• Failure
• Fish Bone diagram
• DFMEA/PFMEA
• Root cause found (if it is critical
dimension related)
• Process control chart used to
standardize the design/process
•
New Product Introduction
• Different types of project Handled by
Changes NPI
Product
Existing/Regul Improvement
ar
Low
Low
Cost
High
Maintenance