Prior to R21, Introduce new carrier With R21, activate new access channel
Yes
No
R l2 _A c e 8 c Para e m te rs
Rel28_ACP_PCO
Optimization
Process C
No
Monitor Stats
ACO Resolved? No
Yes Done
Yes Yes Is the RF energy C3 overshooting across the Zone border? C4 Physical optimization to control energy C5 Is the RF Energy still overshooting? No Monitor Stats
Yes
Yes
ACO Resolved? No
No Yes Does the traffic distribution C6 along the border4 allow for a zone change? No C8 Modify tot_zones and Zone timer (Cell2) Monitor Stats ACO Resolved? Yes Done C9 Add access channel. Monitor ACO of all access Channels (cpcarr 247-250) C7 Move site to next zone, Modify LA. Yes Monitor Stats No ACO ? Resolved Done
No
Process B
Optimization
Are the carriers balanced within 15% of the average carrier load?
No
Capacity Balancing
Yes
Yes
Monitor Stats
Do all carriers have same footprint and sectors load balanced within 15%? No Conduct Antenna and Power audits & match the footprints and load.
No ACO Resolved?
Yes Done
Monitor Stats
No ACO Resolved?
Yes Done
Process A
Yes DONE
AccCh_PgCh_Parms
Rel28_ACP_PCO
Attached is the list of all Paging Channel related parameters and the PSP
recommended Standardized settings. The second spreadsheet lists OMs as of Release 29. Please verify that each of these parameters are set correctly and ensure all Fax flashes to optimize the PCH related parameters have been implemented.
Process A
Process A
PCO Resolved ? DONE
Reference Reports: Page Success Reports: (i) RFISS Excel Stats Data retrieval Generic Report. (ii) Flux (III) RFSM No Page Channel Occupancy Reports: (i) RFISS Implement CLAC paging. Add access channels as needed. Do not degrade Pg. Success Rate. No Yes (ii) Flux (iii) RFSM
Implement Sub-MSC paging. Implement ISPAGE2, as needed. Do Not Degrade Pg. Success Rate.
PCO Resolved ?
DONE
PCO Resolved ? No No
DONE
No Optimize Borders. Optimize LA sizes. Optimize paging strategy. Do not degrade Pg. Success rate.
Add Carrier/s.
Add 2nd Pg. channel. Optimize zones Is the ACO on the zone border sites < 20% ? No DONE No and paging strategy. Monitor stats (cpcarr 240-246).
MOP:
note:
2nd_PgCh_MOP
Deployment of this feature must be closely analyzed and monitored due to potential loss of capacity due to limited forward power availability.