4/19/12 A PRACTICAL TRAINING SEMINAR ON NATIONAL THERMAL POWER CORPORATION LIMITED , ANTA
4/19/12
Inroduction
v
v v v
NTPC Limited is the largest power generating company of India. It is a public sector company, it was incorporated in the year 1975. Total installed capacity is 419 MW. It is situated at district Baran, Anta. Total NTPC the coal & gas based plant are 22 in our India.
Established in
: 1989
Type of station
Location
Total land
: 390.75 acres.
Fuel
Fuel source
Water source
4/19/12
4/19/12
Distance from load center. Availability of land. Availability of fuel. Availability of transportation facilities. Distance from populated area. Type of land.
COMBINED CYCLE
v
4/19/12
It is a Gas Based Combined Cycle Power Project. It is not only the first Gas Power Plant of NTPC but also the beginning of an era of state of art Combined Cycle Power Plants in the country. Combined cycle power plant consist of two power conversion cycles: Bratyon cycle (gas-turbine) and Rankine cycle (steam-turbine)
4/19/12
Gas Turbine
G 16 Stea % m Turbi ne
Air
36 %
4/19/12
Compression : of working medium (air) taken from atmosphere in a compressor. Combustion Increase of working medium temperature by constant pressure ignition of fuel in combustion chamber. Expansion of the product of combustion in a turbine.
Gas Turbine
4/19/12
Pressurisation :
of working medium (water) by Boiler feed water pump. Phase change of working medium (from water to steam) and superheating at constant pressure in Boiler. of the steam in a turbine. of the steam by cooling water.
boile r
Steam turbine
Heating
Expansion
Condensation
4/19/12
Compression : of working medium (air) taken from atmosphere in a compressor. Combustion Increase of working medium temperature by constant pressure ignition of fuel in combustion chamber. Expansion of the product of combustion in a turbine.
Gas Turbine
4/19/12 A PRACTICAL TRAINING SEMINAR ON NATIONAL THERMAL POWER CORPORATION LIMITED , ANTA
4/19/12
Gas Turbine
GT Generator
4/19/12
4/19/12
Waste Heat Recovery Boiler d HP r bo pr u ile es HP m r cir su an p cu re d u Flue gas lat after LP m gas turbine in p g s
6bar Temp.505*C
condensate preheater
Temp.485 *C