PBL SESSION 1
GROUP MEMBERS : MOHAMAD NOR HISHAM AB. KADIR
QUESTION 1
That is easy, the system development life cycle is a series of recommended steps or phases designed as a guideline as to what you should be doing and when you should be doing. This system is quite flexible and some organizations simplify the system development life cycle by combining some of the phases.
System System
Maintenance
System Design
System Analysis
System Planning
QUESTION 2
PURPOSE
Nature of problem Determine the problem Scope Identify which part o be change & outside its control
QUESTION 3
Feasibility
Preliminary review of the facts to see if it is worthy of proceeding to the analysis phase.
Technical
Schedule
Tests
Operational
Economic
QUESTION 4
QUESTION 5
GANTT CHART
over time as a bar chart. It shows the dates of the different required elements of a project. Useful for monitoring the projects progress
Open source, enterprise scale project management application for Microsoft Windows and Unix operating system.
- Issue tracking
QUESTION 6
development.
More time and effort.
Systems being delivered for products and services no longer in use. Unrealistic timescales
Poor or No Requirements
Low level and unhelpful requirements. The developers build what they believe is needed without having any real knowledge of the business.
System is not
Poor Testing
methodically checked.
Inadequate time to
perform tests.
QUESTION 7
INTERVIEW
Advantages
Social cues Can be tape recorded Rapport can be established
Disadvantages
Costly and time consuming Malfunctioning of the tape recorder Users may refuse to cooperate
REVIEW OF DOCUMENTS
Advantages Inexpensive Can independently be done Overcomes the difficulties of encouraging participation by users Disadvantages Time consuming Quality and usability of information cannot be controlled. Not suitable to evaluate opinions, needs or customers satisfaction
OBSERVATION
Advantages First hand information can be obtained Accurate and reliable Disadvantages The pasts cannot be studied Time consuming
QUESTIONNAIRES
Advantages Truthful Cheaper and quicker Disadvantages Exclusion of people Validity is questionable
PROTOTYPING
Advantages Improves relationship between systems development team and users Better identification of systems problems Ensure quality in the eventual system Disadvantages Conflicts between departments Excessive development time of the prototype May cause users confusion of prototype and the finished system
QUESTION 8
Planning
Maintaining
CASE TOOL
Programming
Designing
Consistency
Productivity
Efficiency
Reduced Cost
THANK YOU